feat: Gitea CI, and releases built once, previewed and promoted as one file

ci.yml runs tools/check.sh and the container gate on every push and pull
request, with no secrets. Release 1 builds a version from its release
commit on master or release/*, gates it, and keeps it in a Gitea
pre-release. Release 2 gates that file again on the CI runner and
publishes it to canary (Preview) from the release runner. Release 3
promotes the file Preview ran, on a person's approval. Import records a
release from before Gitea kept the record. All of it is
tools/release-ci.sh calling the existing scripts.

docs/releasing.md: tracks, branches, each step, immutability, rollback,
secrets, runners, Nightly and the hardware lab as designs, the Gitea
administration still to do, and what was measured to make it.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
This commit is contained in:
ekklesia
2026-09-29 18:47:42 -05:00
co-authored by Claude Opus 5.5
parent 583f9b1809
commit 22f25854aa
10 changed files with 1643 additions and 5 deletions
+16 -5
View File
@@ -199,11 +199,15 @@ version newer than its own. So now:
A publish that fails after the local copy into `repo/packages` has spent
that number. Use the next one.
### Canary
### Canary (Preview)
Since 0.2.6.6 releases normally go through Gitea: built once, recorded as
a Gitea release, published and promoted by workflows that call these same
scripts. [releasing.md](releasing.md) has the whole path. By hand:
```
./update_canary.sh 0.2.6.1 # a maintenance release
./update_canary.sh 0.2.7 # the next feature release
./update_canary.sh 0.2.6.7 dist/ekklesia-classroom_0.2.6.7_amd64.deb # gate and publish THAT file
./update_canary.sh 0.2.7 # build, gate and publish
```
The version is always given. With four parts there are two possible next
@@ -211,17 +215,24 @@ numbers, and which one a release is depends on what is in it. Run with no
argument it prints the current canary and both candidates, and builds
nothing.
Given a package, that file is what is gated and published; nothing is
rebuilt, because a second build is a second, untested file. The gate is
`tools/release-gate.sh`: a fresh install, and the upgrade from whatever
canary and stable serve, each on a room of that channel;
`RELEASE_GATE_FROM=0.2.2` adds an older release rooms are still on.
### Stable
```
./update_stable.sh 0.2.6.1
./update_stable.sh 0.2.6.6 <sha256>
```
Only with the owner's written approval for that release. Stable is never
given a package of its own: it is pointed at one canary already published,
byte for byte, and refuses a version that is not newer than stable's
current one or whose package the server does not hold with the same
checksum.
checksum. With the sha256 — always give it — it refuses any file but the
one that was approved.
### Checking a channel without changing it
+512
View File
@@ -0,0 +1,512 @@
# Releasing Ekklesia Classroom
How a change becomes a package, how that package reaches a classroom, and
who decides each step. Written so it can be followed months from now by
somebody who was not there when it was set up.
The short version: **Gitea is the record, updates.riverofglorymn.org is
the delivery, and a person makes every decision that reaches a room.**
```
pull request ──► CI (checks, package, container gate) automatic, no secrets
│
merge to master or release/X.Y
│
Release 1 - build ──► Gitea pre-release vX.Y.Z: .deb, SHA256SUMS, a person runs it
│ build-info.json, gate report, notes
Release 2 - Preview ──► the same file on canary; read back; recorded a person runs it
│
physical checks on real hardware (docs/testing.md) a person does them
│
Release 3 - Stable ──► the same file on stable; read back; recorded a person runs it
```
Nothing is rebuilt after step 1. The file the gate passed is the file the
laptop installs and the file the desktops install, byte for byte, and its
SHA-256 is written down at every step.
## The tracks
| Track | What it is | Where classrooms get it | Who is on it |
| --- | --- | --- | --- |
| **Stable** | Approved for production: passed the gate, ran on Preview, and passed the physical checks on real hardware | `https://updates.riverofglorymn.org/stable/` | The three classroom desktops |
| **Preview** | A finished release candidate, frozen, waiting for its physical checks | `https://updates.riverofglorymn.org/canary/` — Preview **is** the canary channel | The prayer-room laptop |
| **Nightly** | Development builds of the next version, for lab machines | not yet — see [Nightly](#nightly-designed-not-yet-active) | Nobody yet; never a classroom |
"Preview" is a new name for an old channel. The URL, the manifest and the
laptop's `CHANNEL=canary` are unchanged: renaming a production path would
strand the one machine on it for no gain. The scripts still say canary.
A Gitea release is a **pre-release** while its version is only on Preview
and becomes a full release when it is promoted to Stable.
## Versions
As in `tools/release-lib.sh`: `0.2.6` is a feature release, `0.2.6.1` its
first maintenance release, `0.2.7` the next feature release. Three or four
numbers, no leading zeros, and ordering is always `dpkg --compare-versions`.
**A version is used once.** Once any file of that name has been on the
update server it is never rebuilt or replaced — 0.2.6 was, and no room that
had the first one could ever be offered the second. The release tag is
`v` + the version (`v0.2.6.6`) and is never moved.
## Branches
| Branch | What it holds | Who merges |
| --- | --- | --- |
| `master` | The integration branch: the next version's development (0.3.0 now). Every change arrives by pull request with CI green | Anyone with write access, after review |
| `release/X.Y` | A maintenance line (`release/0.2`): fixes only, each one a pull request, each release built from here. Created when a release has to be maintained while `master` moves on — which is now | Same |
| short-lived branches | One change each (`fix/…`, `feat/…`, `docs/…`), deleted after merge | — |
| `experiment/*` | Work that may never ship. Not built as releases | — |
Why this and not more: the repository has always been one line of work on
`master`, and what it lacked was only a place for 0.2.x to wait while 0.3.0
starts. One maintenance branch per line, created when it is needed, does
that. There is no `develop` branch, because `master` already is one, and no
branch per channel, because a channel is a manifest pointing at a file, not
a line of code.
**Releases are tags, not branches.** `v0.2.6.6` names the exact commit the
package was built from. Stable and Preview are not branches at all.
**Fixes flow forward.** A fix made on `release/0.2` is merged into `master`
afterwards (`git merge release/0.2`, as a pull request), never cherry-picked
backwards from `master`. A merge keeps both lines' histories honest and
makes it impossible to forget a fix in the newer line. If `master` has moved
too far for a clean merge, the fix is re-done on `master` in its own pull
request that says so.
**A frozen candidate.** 0.2.6.6 is tagged `v0.2.6.6` on `release/0.2`. While
it waits for its physical checks, 0.3.0 work lands on `master` and cannot
touch it. If the checks fail, the fix goes to `release/0.2`, becomes 0.2.6.7,
and is merged forward.
### Protecting the branches (Gitea settings)
For `master` and `release/*`: no force push, no deletion, and merging only
from a pull request whose **CI / checks** and **CI / package and container
gate** statuses are green. See [Gitea administration](#gitea-administration-still-to-do).
## Pull requests and commits: CI
`.gitea/workflows/ci.yml`, on every push to any branch and every pull
request, on the `ekklesia-ci` runner, with **no secrets**:
1. **checks** — `tools/check.sh --base <where the change started>`:
- every script's syntax by its `#!` line, every Python module, every JSON
policy and wallpaper metadata file;
- the change's hygiene: `git diff --check`, no `.deb`, `dist/`, `repo/` or
`packaging/root/` committed, and `VERSION` a valid release version;
- the teacher's manual, rebuilt and checked against itself;
- every `tests/test-*.sh`: configuration, migration, desktop layout and
wallpaper convergence, printing (no paper: the queue, the options, the
picture pipeline), Wonder Ink workspace, Presentations, audio, network
and Wi-Fi adoption, the updater and its schedule, release versions and
the release tooling, deployment support, and the Gitea release record.
The log of each is kept as the `check-logs` artifact, with a
`summary.md` table.
2. **package and container gate** — builds the package the commit's
`VERSION` describes, proves it says that version, and installs it on a
clean Debian 13 container with `tools/release-gate.sh --ci`: fresh, and as
an upgrade from whatever canary and stable serve. Between releases
`master`'s `VERSION` equals what canary already serves, so an upgrade
that is not possible is recorded as **SKIP**, with the reason, not
failed. The package contents and the gate report are kept; **the package
itself is not**, because it is not a release and must never be mistaken
for one.
A test added to `tests/` runs in both jobs, and in every release build, with
nothing else to edit: `tools/build-release.sh` runs the same
`tools/check.sh` before it builds.
What CI does not do: the GUI lab (`tools/lab/`), which needs the nested
Plasma session on the development VM, and anything on real hardware. Those
are run by hand before a release, and their results written into the
release commit and the Gitea release.
## Building a release
1. On `master` (a feature release) or `release/X.Y` (maintenance), make
the release commit: `VERSION` set to the new version and the manual
rebuilt, nothing else:
```
echo 0.2.6.7 > VERSION && tools/build-manual
git commit -m "release: 0.2.6.7, for the canary machine only" VERSION docs/manual/build
```
and merge it by pull request like anything else.
2. Run the GUI lab against a local build (`tools/lab/dirty-upgrade`, from
the release stable rooms are on and from canary's), and note the result.
3. In Gitea: **Actions → Release 1 - build → Run workflow**, on that branch,
with the version (and `0.2.2` or whatever older release rooms are still
on, to rehearse that upgrade too).
`tools/release-ci.sh build` then:
- refuses unless the branch is `master` or `release/*`, the checkout is
clean, and `VERSION` already says the version;
- refuses a version that has a Gitea release or tag, whose package is on the
update server, or that is not newer than what canary and stable serve;
- builds with `SOURCE_DATE_EPOCH` set to the commit's time, so the manual's
revision date is the commit's and the build changes nothing in the tree —
and **fails if it did change anything**, because then the package would not
be the commit;
- writes `SHA256SUMS` and `build-info.json` (version, package, sha256, full
commit, branch, time, the run that built it, and the version dpkg reads
from the file);
- runs the full gate, `tools/release-gate.sh`, on that file;
- creates the Gitea **pre-release** `vX.Y.Z` tagged at the commit, with the
package, `SHA256SUMS`, `build-info.json`, the gate report, the check
summary, and notes listing the changes since the previous tag.
The sha256 it prints is the release's name from then on.
## Publishing to Preview
**Actions → Release 2 - publish to Preview (canary) → Run workflow**, with the
version and its sha256 from the Gitea release. Two jobs:
- **gate**, on `ekklesia-ci` with no secret: downloads the release's `.deb`,
proves it is that sha256, that the release's `SHA256SUMS` says so, and that
dpkg reads the version from it; runs the full gate again, against what
canary and stable serve *now*; attaches the report to the release under a
new name.
- **publish**, on `ekklesia-release` with the update server's key:
downloads the same file and that report and runs
`update_canary.sh VERSION PACKAGE` with the report. `update_canary.sh`:
- refuses a version that has ever been published, or is not newer than
everything that has (asked of the server itself, over ssh);
- accepts the gate report only if it names this file's sha256, passed, and
upgraded from exactly the versions canary and stable serve now — a report
made before either moved is refused, and the gate has to be run again;
- uploads the package with `rsync --ignore-existing` and proves the server's
copy is the same bytes, writes the manifest **after** the package, swaps
`canary/latest.deb` by rename **after** the manifest, and reads all three
back over HTTPS the way a classroom does.
`tools/release-ci.sh preview` then checks that exactly one file was added
to the server's packages and none changed, and records on the Gitea release
that the file went to Preview, with its sha256 and the read-back.
The laptop takes it at its next update check (daily at 03:00, caught up after
a night off) and reboots once nobody is using it.
## Physical approval
The gate and the lab cannot stand in for a real television, a real lid, a
real DVD drive, real speakers or a real reboot. `docs/testing.md` lists what
a person checks for each release on real hardware — for 0.2.6.6, the section
[Before 0.2.6.6 goes to stable](testing.md#before-0266-goes-to-stable).
Only a person does these, and only a person records them. Nothing in CI
claims a physical check passed.
## Promoting to Stable
**Actions → Release 3 - promote to Stable → Run workflow**, with the version,
its sha256, the approval (who, when, which checks, on which machine), and the
confirmation `PROMOTE X.Y.Z TO STABLE`. On `ekklesia-release`:
- it refuses unless the Gitea release records **that sha256** going to
Preview: only what Preview ran can be promoted;
- `update_stable.sh VERSION SHA256` refuses any other file, refuses a version
not newer than stable, refuses unless the server already holds exactly that
package, then points `stable/manifest.json` and `stable/latest.deb` at it
and reads them back over HTTPS. **No build, no upload, no new file**;
- it proves no package on the server changed, records the promotion and the
approval on the Gitea release, and marks it no longer a pre-release.
The desktops take it at their next 03:00 check.
Merging code never promotes anything. There is no path from a push to
Stable that does not pass through a person running this workflow.
## Without a runner: the same steps by hand
Every workflow step is a script, so a release never depends on a runner
being up. From a checkout with the update server in `~/.ssh/config` as
`classroom-control` (as the development VM has always had) and a Gitea token
with repository write access:
```
export GITEA_URL=https://git.riverofglorymn.org
export GITEA_REPO=River_of_Glory_Church/Ekklesia_Classroom
export GITEA_TOKEN=… # never committed
tools/release-ci.sh build 0.2.6.7 0.2.2
tools/release-ci.sh gate 0.2.6.7 <sha256>
tools/release-ci.sh preview 0.2.6.7 <sha256> <gate-report name>
tools/release-ci.sh stable 0.2.6.7 <sha256> "physical checks passed on …, by …, on …"
```
And, as before and still true, the underlying tools alone:
```
./update_canary.sh 0.2.6.7 dist/ekklesia-classroom_0.2.6.7_amd64.deb # gate + publish that file
./update_stable.sh 0.2.6.7 <sha256> # promote that file
```
`update_canary.sh VERSION` with no package still builds one first, for
compatibility; handing it the file you tested is the better habit.
## Immutability: three locks
1. **The update server.** `release_check_new_version` refuses a version whose
file name has ever been used or that is not newer than every version ever
published; `rsync --ignore-existing` will not overwrite a package even if
that check were wrong; every upload is read back by sha256.
2. **The Gitea release.** Gitea itself lets anyone with write access delete an
asset and upload another of the same name, and Gitea 1.27 has no setting
to stop it. `tools/gitea-release` is the only thing the workflows use to
write releases, and it uploads an asset only under a name the release does
not have; the same bytes again are left alone; different bytes fail
loudly and change nothing. A tag is never moved. The record under
"## Record" is only appended to. A person with write access can still
delete things in the web UI — don't; nothing automated will put them back.
3. **The checksum everywhere.** The sha256 is in the Gitea release, its
`SHA256SUMS`, `build-info.json`, the gate reports, the update server's
manifest and the release commit's follow-up. Preview and Stable both
require it as an input and refuse a file that does not match.
## Gitea Releases and updates.riverofglorymn.org
| | Gitea release `vX.Y.Z` | updates.riverofglorymn.org |
| --- | --- | --- |
| Purpose | The permanent record: why, from what, how it was checked, what happened | Delivery to classrooms |
| Read by | People | Each classroom's updater, daily |
| Holds | The `.deb`, SHA256SUMS, build info, gate reports, notes, the record of Preview and Stable | `packages/*.deb`, and per channel `manifest.json` and `latest.deb` |
| Decides what a room installs | No | Yes: the channel's manifest |
The two always hold the same bytes. The update server stays the only thing
a classroom talks to: a Gitea outage, a Gitea upgrade or a Gitea migration
never touches a room.
## Rollback and recovery
**A classroom never installs an older version.** The updater only takes a
version newer than its own (it has to: otherwise two channels could
ping-pong a room), and `update_stable.sh` refuses to move stable backwards,
because a room would ignore it anyway. So:
- **A bad release on Preview only** (the laptop): do not promote it. Fix
forward: the fix, or a revert, becomes the next version, through the same
gate and Preview. The bad file stays on the server — it is a version that
was published, and deleting it would only hide what the laptop is running.
- **A bad release on Stable**: the same, faster. Build the next version from a
revert of the bad change (on `release/X.Y`), gate it, Preview it, and
promote it as soon as the specific failure is shown fixed on real hardware.
Stable points at a *new* version whose content is the last good one.
- **One room that must go back now**, before a fix exists: by hand on that
machine, `sudo apt-get install --allow-downgrades ./ekklesia-classroom_<good>_amd64.deb`
with the file from its Gitea release, then reboot. It stays there until a
newer version is published to its channel.
- **A publish interrupted half way**: the manifest is written after the
package and `latest.deb` after the manifest, so a room either sees the old
release or the whole new one. Re-running the same workflow is safe: the
version checks refuse to publish twice, so check the Gitea release's record
and `release_verify_channel` before re-running anything.
- **A lost Gitea**: the update server still has every package, and the tags
are in every clone. `Release - import an existing release` rebuilds the
record from the server's files.
## Secrets, variables and credentials
None of these are in the repository, and none are given to CI.
| Name | Kind | Holds | Used by |
| --- | --- | --- | --- |
| `CLASSROOM_UPDATES_SSH_KEY` | repository **secret** | The private key the release runner uses to publish to the update server | Release 2 (publish job), Release 3 |
| `CLASSROOM_UPDATES_ADDRESS` | repository variable | The update server's address from the runner (`10.40.0.2`) | Release 2, 3 |
| `CLASSROOM_UPDATES_USER` | repository variable | The account that key logs in as | Release 2, 3 |
| `CLASSROOM_UPDATES_KNOWN_HOSTS` | repository variable | The server's ssh host key line(s), so the job refuses any other host | Release 2, 3 |
| `RELEASE_API_TOKEN` | repository secret, **optional** | A token that may write releases. Only needed if the automatic Actions token ever cannot; measured on Gitea 1.27.2, it can | Release 1, 2, 3, import |
| automatic Actions token | provided by Gitea per job | Creates and records releases | Release 1, 2, 3, import |
Variables are not secret: a pull request's jobs can read them (measured). Put
nothing in a variable that would matter if it were printed.
**Least privilege for the publish key.** Today the development VM publishes
as `media@10.40.0.2`, and `media` is in the `sudo` and `docker` groups on that
host — which also runs Gitea, Home Assistant and Vaultwarden. That key must
**not** be the one put in Gitea. Before the release workflows are used:
1. On 10.40.0.2, create an account used for nothing else (say
`classroom-publish`), in no group but one that may write
`/srv/ekklesia/classroom-updates` — not `sudo`, not `docker`.
2. Generate a new key pair for it on a trusted machine; put the public half
in its `authorized_keys` with `restrict,from="<release runner address>"`;
put the private half in `CLASSROOM_UPDATES_SSH_KEY`; delete the local copy.
3. Set the three variables above.
The scripts need `ls`, `test`, `sha256sum`, `cat`, `ln`, `mv` and `rsync`
there, and nothing else.
## Runners
| Label | Runs | Needs | Must not have |
| --- | --- | --- | --- |
| `ekklesia-ci` | CI on every push and pull request; Release 1; the gate job of Release 2; import | Debian 13, Docker (the container gate), git, python3, dpkg-deb, curl, rsync, nodejs (for `actions/checkout`), the fonts and tools the tests use — in practice, a VM set up like the development VM | Any credential for the update server or a classroom; a route to classrooms it does not need |
| `ekklesia-release` | Release 2's publish job, Release 3 | ssh, rsync, curl, python3, dpkg-deb, git, nodejs; network to 10.40.0.2 | Docker; any key on its disk; any other label |
| `classroom-hw-*` (future) | Hardware checks, by hand only | A real classroom computer in the lab | Anything to do with production rooms |
**How the separation holds, and where it doesn't** — measured on a local
Gitea 1.27.2 with act_runner 0.6.1:
- A pull request from a **fork** does not run at all until a maintainer
approves it. Approved, it gets **no secrets**. It does get the variables
and a token, and it runs on whichever runner its workflow names —
including `ekklesia-release`, if it asks for that label.
- A branch pushed to this repository runs with the repository's secrets.
**Anyone with write access can publish**, by writing a workflow that uses the
key. Give write access accordingly.
So: the key lives only in Gitea's secret store, never on a runner's disk,
where an approved fork job could read it. The `ekklesia-release` runner runs
each job in a fresh container (`ekklesia-release:docker://node:22-trixie`,
without the Docker socket), so no job can leave anything behind for the
next. **Never approve a fork's run that changes `.gitea/workflows/`**
without reading it.
`ekklesia-ci` needs Docker for the container gate, and Docker is root on its
host. Treat that host as something any approved pull request can take over:
a VM with nothing on it worth taking, and no key to anything else.
**Registering a runner** (on the runner's host, as the account it runs as):
```
act_runner generate-config > config.yaml
# edit runner.labels in config.yaml: [ "ekklesia-ci:host" ]
# (measured: labels in the config file OVERRIDE --labels at registration;
# a generated config lists ubuntu-latest etc. and the runner then
# advertises those, and every job here waits for ever)
act_runner register --no-interactive -c config.yaml \
--instance https://git.riverofglorymn.org --token <from Gitea> --name ekklesia-ci-1
act_runner daemon -c config.yaml # as a systemd service
```
The registration token is under the repository's **Settings → Actions →
Runners**. Register at repository level, not instance level, so these
runners take no other repository's jobs.
Artifacts: `actions/upload-artifact@v3` works on Gitea 1.27.2; **v4 fails**
("not supported on GHES", measured). The workflows use v3.
## Nightly (designed, not yet active)
For installable 0.3.0 development builds, separate from a frozen Preview.
- **Source:** `master`, a commit whose CI passed.
- **When:** once a night if `master` changed since the last nightly, and on
demand. Not every commit: a lab machine that reboots into a new build every
hour tests nothing.
- **Version:** `<next>~nightly.<YYYYMMDD>.<run>`, for example
`0.3.0~nightly.20261014.3`. The `~` makes it sort **before** `0.3.0` and
after every 0.2.x, and each night after the last — so a lab machine moves
to the real 0.3.0 when it ships. The release version rules
(`tools/release-lib.sh`, and the same pattern in the updater) refuse `~`
today; they must accept it for the nightly channel only.
- **Server:** `/nightly/manifest.json`, `/nightly/latest.deb`, and packages in
`/nightly/packages/` — **not** `/packages/`. The rule that a release must be
newer than everything ever published reads `/packages/`; a nightly there
would make 0.2.6.7 "older" than a 0.3.0 nightly and block every
maintenance release.
- **Retention:** the last 14 nightlies on the server; older ones deleted from
`/nightly/packages/` only. No Gitea release per nightly; the build is a
workflow artifact, kept as long as Gitea keeps artifacts.
- **Opting in:** a lab machine's `device.conf` says `CHANNEL=nightly`, and its
first nightly is installed by hand.
- **Never a classroom:** the nightly updater refuses `CHANNEL=nightly` unless
`/etc/ekklesia-classroom/lab-machine` exists, and a nightly package refuses
to install without it. A nightly machine never reads the stable or canary
manifest, and it cannot drift onto them: its version is newer than any
0.2.x, so pointed at stable it would simply sit until stable passes it.
Taking it back to 0.2.x is a reinstall with `--allow-downgrades`, by hand.
- **Credential:** its own key, allowed to write `/srv/ekklesia/classroom-updates/nightly`
and nothing else (`CLASSROOM_NIGHTLY_SSH_KEY`).
What activating it needs, which is why it is not active: the updater and
release-lib changes above ship **inside the package**, so they are 0.3.0
work; plus the server directory, the key, and a `nightly.yml` workflow. That
is the next infrastructure task, after the backlog audit decides what 0.3.0
is.
## The hardware lab (designed, not yet built)
Spare classroom computers, each a runner labelled `classroom-hw-<kind>`
(`classroom-hw-desktop`, `classroom-hw-laptop`), registered to this
repository, in a lab network with no path to production rooms, on
`CHANNEL=nightly` or on whatever a job installs.
- **Triggered only by hand** (`workflow_dispatch`) with a version and sha256 —
never by a pull request or a push.
- **Installs the exact file** from its Gitea release through apt, proves dpkg
reports that version, then runs checks from `tools/hw/` (to be written):
HDMI connect/disconnect (the display count and the desktop's wallpaper
before and after), HDMI audio (the sink appears, is chosen, plays),
the DVD drive (seen, a disc read), the printer (queue state; a real page
only with an explicit input), Wi-Fi recovery (down, up, reconnected with
nobody typing), sleep/wake (`rtcwake`, and what is standing after), and
reboot/update (a job that reboots the machine and a second job that reads
what came back).
- **Reports** one line per check into `hardware-report-<machine>-<date>.txt`:
```
AUTO PASS hdmi-hotplug 2 -> 1 -> 2 outputs; desktop 1 kept its wallpaper
AUTO FAIL dvd-read no disc in /dev/sr0
MANUAL - picture-visible not checked by a machine
```
attached to the Gitea release, with a record line summarising it.
`AUTO` lines come only from a script that measured something. `MANUAL`
lines are only ever `-` from a machine; a person's result is written by the
person, in the Stable workflow's approval, and nowhere else. A machine
never ticks a physical check.
- **Does not block** CI or releases. Until it exists, physical checks are
done by a person from `docs/testing.md`, exactly as now.
## Gitea administration still to do
Things only a Gitea administrator can do, none of which this repository can
do for itself:
- [ ] Say which host the existing "Ekklesia" runner is on, and its labels. It
is not on 10.40.0.2, and the Gitea API does not show runners to anyone
but an administrator. Relabel it `ekklesia-ci:host` (in its config
file, see above) if it is fit for that role, or register a new one.
- [ ] Set up an `ekklesia-release` runner as above: container mode, no Docker
socket, repository level.
- [ ] Create the `classroom-publish` account and key on 10.40.0.2, and the
secret and three variables above.
- [ ] Protect `master` and `release/*`: no force push, no deletion, required
status checks **CI / checks** and **CI / package and container gate**.
- [ ] Under the repository's Actions settings, keep approval required for
runs from forks (the default, measured).
- [ ] Run **Release - import an existing release** for 0.2.6.6 (version,
sha256 and commit are in the release commit and in
`docs/testing.md`) so its Gitea release exists before its promotion.
## What was measured
On a throwaway Gitea 1.27.2 with act_runner 0.6.1 (the versions production
runs), on the development VM, 2026-09-29:
| Question | Answer |
| --- | --- |
| Do all five workflows parse, and plan only on their own events? | Yes: CI on push and pull_request; the release workflows only on a manual run |
| Does the CI checks job pass on a real runner? | Yes: 30 of 30, and its logs upload as an artifact |
| Can the automatic token create a release, attach an asset, edit the notes? | Yes |
| Does `tools/gitea-release` refuse different bytes under a published name, on real Gitea? | Yes |
| Do `github.event.inputs.X` and `inputs.X` both work? | Yes |
| Do job outputs pass from a job on one runner to a job on another? | Yes |
| Do `vars.*` and `secrets.*` reach a job, and is the secret masked? | Yes, and yes |
| `upload-artifact@v3` / `@v4`? | v3 works; v4 fails ("not supported on GHES") |
| Do labels given to `act_runner register` survive a generated config? | **No**: the config's labels win |
| Does a fork's pull request run without approval? | No: held until a maintainer approves |
| Approved, does it get secrets? | No. It gets variables, a token, and any runner it names |
Not measured, because it needs the real update server's key in a real
runner: the publish and promote jobs end to end. Their scripts are the ones
used by hand since 0.2.6, and `tests/test-release-ci.sh` runs them against a
stand-in server and a stand-in Gitea.