Two problems in the migration commands: no timeouts, and SQL split on literal
bytes.
`migrations:plan` and `migrations:apply` constructed their connection with
neither a connection deadline nor an operation deadline — a real server reported
`statement_timeout = 0` on the migration connection. Both now default to 10
seconds for the connection deadline, the client query timeout, and PostgreSQL's
own statement_timeout, applied at the one shared construction boundary so a
future call site cannot silently omit them. History reads, advisory-lock
queries, transaction control, migration SQL, and history writes are all covered.
The existing lock-wait deadline, the Pass 2 TLS policy, and Doctor's and the
bootstrap CLI's own timeouts are untouched, and no environment variable or flag
was added.
Explicit client fields do not win under the pinned driver. [email protected].0 builds
parameters as `Object.assign({}, config, parse(config.connectionString))`, so
the URL overrides passed options — verified directly, where an explicit
statement_timeout of 10000 alongside `?statement_timeout=0` produced a
server-reported 0, while a clean URL produced 10s. A DATABASE_URL carrying
connect_timeout, query_timeout, statement_timeout, or an `options` value setting
statement_timeout is therefore refused with the existing fixed configuration
error, before any client is constructed and without echoing the URL, parameter,
or value. Unrelated parameters are left alone.
The runner split each migration on the literal `--> statement-breakpoint` bytes.
Those bytes inside a string literal, a dollar-quoted function body, a quoted
identifier, or a comment tore the migration into fragments that were no longer
valid SQL — each case verified to produce two fragments where one was required.
Each migration's exact SQL is now passed to the client once, with no values and
no prepared-statement name, inside the existing transaction, and its history row
inserted only after that batch succeeds. One transaction still spans all pending
migrations; advisory locking, checksum validation, approval preflight, ordering,
rollback, cleanup, and sanitized error identity are unchanged. The port method
is renamed executeStatement to executeMigrationSql so the contract says what it
receives.
PostgreSQL parses the batch because it owns the only correct parser. A homegrown
splitter would have to track single quotes, dollar quoting with arbitrary tags,
quoted identifiers, line comments, nested block comments, and escape syntax to
answer a question the server already answers, and a parser dependency would add
supply-chain surface for the same reason. Drizzle's marker lines are ordinary
`--` comments when the batch is sent whole. No custom SQL parser exists here.
Co-Authored-By: Claude Opus 5 <[email protected]>
Add ADR 0016 recording the accepted module database access design (ModuleDatabase, the frozen
ModuleRuntimeServices boundary, one pool/one facade/one services-object identity, explicit
migrations, and the trust model), with narrow cross-reference corrections to ADR 0006 and ADR 0015
where their original text is now inaccurate. Sweep docs/development/api.md,
docs/development/authorization.md, docs/module-development/README.md, docs/development/testing.md,
and docs/development/identity.md for the new database boundary and remaining Phase 4C staleness;
correct the stale "Phase 4C is next" roadmap paragraph in platform-architecture.md and the matching
gap in README's current-status narrative. Extend the module template with a permissioned
GET /records route reading through context.services.database, using the canonical
createModuleTable helper, with matching template tests.
Phase 5B, pass 3: adds ADR 0015 recording the durable module HTTP
routing and production runtime lifecycle architecture pass 1 and pass
2 implemented, extending ADR 0006 and ADR 0014 without superseding
either. Adds narrow cross-reference notes to both, and to the ADR
index, pointing at ADR 0015 for the work they deferred, while
preserving their historical text and accepted status.
Corrects stale forward-looking "pass 2"/future-tense language left
over from pass 1 in core/src/modules/runtime.ts and
packages/contracts/src/module-http.ts (comment-only; production
behavior unchanged), and a shutdown-lifecycle description in
docs/development/testing.md that predated the module-runtime-stop
step pass 2 added between draining the HTTP server and closing the
pool.
Full audit against origin/main...HEAD found the architecture,
contract, startup ordering, routing, authorization/origin
enforcement, and PostgreSQL integration coverage from passes 1-2
sound; the one concrete defect found (Vary-header merge producing an
invalid "*, Origin, Cookie" combination and case-sensitive duplicate
tokens) was already fixed with focused regression tests in a separate
commit (bf76f4e), not amending either checkpoint commit.
Co-Authored-By: Claude Sonnet 5 <[email protected]>